The West Link is a railway connection in a tunnel under the center of Gothenburg. The tunnel will connect commuter rail services to routes that pass through the city, and give rise to three new stations in Gothenburg. The new railway tunnel will facilitate travelling. Train frequency can be increased, travel times made shorter and passengers can reach more destinations without transfers. Find more info in the case study.
The Varberg tunnel project is approximately 3.1 km long double track railway tunnel under central Varberg (2.8 km of which are rock tunnel and 300 m concrete tunnel). Accompanied by a 2.7 km long rock service tunnel which runs parallel to the railway tunnel. Both tunnels are connected by 9 connecting bypass tunnels. The other parts of the project consist of 800 m long concrete through at the north tunnel portal, new station house, new freight yard and approximately 7.5 km of double track rail in total.
Otterhällan is the second of the five contracts being negotiated in Haga. The Otterhällan subproject consists of a rock tunnel section between the Rosenlund subproject and the Stora Hamn Canal subproject. The contract covers a stretch of approximately 500 meters between Rosenlundsplatsen and the Hamnkanalen and consists of a double-track tunnel and two service tunnels in rock. Through the subproject, the Västlänken will pass a number of underground structures, such as the Göta Tunnel, garages and shelters, and will construct two concrete bridges.
Main work was managing, performance and processing of surveyors works at objects D01–D08 (except D02) and object A2T, first at “installations galleries” – tunnels for particle accelerator networks such as cooling; later also at ground parts of mentioned objects (including three lift shafts at D08 object) and other objects at site. Surveyors works included mainly staking-out positions and heights of each concrete construction, including staking-out and check corresponding reinforcement for control concrete cover.
Your matter will be handled by Trigorn co-founder and surveyor with 20 years of experience
David Žďánský
Manage consent
To provide the best experiences, we use technologies such as cookies to store and/or access device information. Consenting to these technologies allows us to process data such as browsing behavior or unique IDs on this website. Not consenting or withdrawing consent may adversely affect certain features and functions.
Funcional
Always active
Technické uložení nebo přístup je nezbytně nutný pro legitimní účel umožnění použití konkrétní služby, kterou si odběratel nebo uživatel výslovně vyžádal, nebo pouze za účelem provedení přenosu sdělení prostřednictvím sítě elektronických komunikací.
Předvolby
Technické uložení nebo přístup je nezbytný pro legitimní účel ukládání preferencí, které nejsou požadovány odběratelem nebo uživatelem.
Statistic
Technické uložení nebo přístup, který se používá výhradně pro statistické účely.Technické uložení nebo přístup, který se používá výhradně pro anonymní statistické účely. Bez předvolání, dobrovolného plnění ze strany vašeho Poskytovatele internetových služeb nebo dalších záznamů od třetí strany nelze informace, uložené nebo získané pouze pro tento účel, obvykle použít k vaší identifikaci.
Marketing
Technické uložení nebo přístup je nutný k vytvoření uživatelských profilů za účelem zasílání reklamy nebo sledování uživatele na webových stránkách nebo několika webových stránkách pro podobné marketingové účely.